0.2 Calculate the quantities of tunnel for using the take-off list and the section details shown in Figure 2.1. The leng

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

0.2 Calculate the quantities of tunnel for using the take-off list and the section details shown in Figure 2.1. The leng

Post by answerhappygod »

0 2 Calculate The Quantities Of Tunnel For Using The Take Off List And The Section Details Shown In Figure 2 1 The Leng 1
0 2 Calculate The Quantities Of Tunnel For Using The Take Off List And The Section Details Shown In Figure 2 1 The Leng 1 (30.71 KiB) Viewed 17 times
0.2 Calculate the quantities of tunnel for using the take-off list and the section details shown in Figure 2.1. The length of tunnel is 1500 m. 18 Marks Take off List: CESMM3 T20 18x18 Mrks: i. ii. li TV Earthwork excavation Mesh reinforcement Primary cast concrete 200 mm thick C75. Formwork for primary cast concrete. Reinforced shotcrete 20 cm thick C40. After primary cast concrete. Prepare a bill of quantities by using present market rates for the above items. Also add the provisional sums and prime costs. 100 mm thick blinding concrete 1:2:4" v vi vii ity ont 225 m 2m Primary Carte 2 whick 5. hesrete 15.ommicks 5.2. Mestrement SJ 100 mm thick lean concrete 124 DV Figure 2. / Cross section of an inverted archael