A project developer intends to deploy a 5MW photovoltaic project and feed the generated power into the grid. The utility

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A project developer intends to deploy a 5MW photovoltaic project and feed the generated power into the grid. The utility

Post by answerhappygod »

A Project Developer Intends To Deploy A 5mw Photovoltaic Project And Feed The Generated Power Into The Grid The Utility 1
A Project Developer Intends To Deploy A 5mw Photovoltaic Project And Feed The Generated Power Into The Grid The Utility 1 (34.77 KiB) Viewed 32 times
A project developer intends to deploy a 5MW photovoltaic project and feed the generated power into the grid. The utility is proposing a feed in tariff of MUR 3.5/kWh. In which part of Mauritius do you think such a project should be deployed? Assume that the system cost for a turnkey project is MUR 50000/kW, cost of land is MUR 1M/ acre, land requirement is 2 acres/MW, operation and maintenance cost is MUR 1500/kW, the system may require replacement of power electronics costing MUR 50M in 15 years, discount rate, d=2.5% and inflation, i=3.5%, overall efficiency of the system is 80% over the life time of the project and the proposed contract period is 20 years.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!