As part of the same site but in a different network, the client would like to use an existing nearly fully loaded transf

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

As part of the same site but in a different network, the client would like to use an existing nearly fully loaded transf

Post by answerhappygod »

As part of the same site but in a different network, the clientwould like to use an existing nearly fully loaded transformer todeliver 600kVA to another industrial load with a power factor of0.8, this time using a connection to the main grid. The client isanticipating a growth in active power demand of 25% for this loadin the near future. One of your colleagues has suggested the use ofcapacitors to accommodate this growth without violating thetransformer's capacity limit.
3) Your line manager has asked you to calculate the totalreactive power that these capacitors would need to provide so theclient won't have to purchase a larger transformer.
4) What other measure could be taken to avoid the transformerfrom overloading? Justify your answer and highlight benefits andpotential drawbacks of the solution proposed?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!