Problem 1 [25 points]: Figures below are for two generators working in parallel and supplying a load: fsys Assume: Gen 1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem 1 [25 points]: Figures below are for two generators working in parallel and supplying a load: fsys Assume: Gen 1

Post by answerhappygod »

Problem 1 25 Points Figures Below Are For Two Generators Working In Parallel And Supplying A Load Fsys Assume Gen 1 1
Problem 1 25 Points Figures Below Are For Two Generators Working In Parallel And Supplying A Load Fsys Assume Gen 1 1 (39.1 KiB) Viewed 30 times
Problem 1 [25 points]: Figures below are for two generators working in parallel and supplying a load: fsys Assume: Gen 1 - Gen 2 Load Slope = 1 MW/Hz P₁[MW] Gen 1 0 --61.5 Hz ---61 Hz Slope = 1 MW/Hz Gen 2 P₂ [MW] • Gen 1 has a no-load frequency of 61.5Hz and a slope (SP1) of 1 MW/Hz • Gen 2 has a no-load frequency of 61.0Hz and a slope (SP2) of 1 MW/Hz • The total value of the loads is 2.5MW at 0.8 PF (Lagging) (a) Find the system frequency. (b) - Assuming the load is 3.5MW, find the power supplied by each generator.