- Activity 7 2 Spreadsheet Activity Refer To The Cost Data And Estimate Summary Sheet No 7 2 In The Online Learner Resour 1 (209.75 KiB) Viewed 38 times
Activity 7-2-Spreadsheet Activity Refer to the cost data and Estimate Summary Sheet No. 7-2 in the online learner resour
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Activity 7-2-Spreadsheet Activity Refer to the cost data and Estimate Summary Sheet No. 7-2 in the online learner resour
Activity 7-2-Spreadsheet Activity Refer to the cost data and Estimate Summary Sheet No. 7-2 in the online learner resources. Take off the square feet of CMUs for the 6'-0" high foundation walls of a 25'-0" X 70'-0" building. Determine the total material and labor cost for the CMU walls. COST DATA Material Unit Unit Cost Material Labor Unit Cost Concrete masonry units sq ft 1.36 2.67