Problem Solving. Show your detailed solution. 1. From the figure below, estimate the time required for each activity, de

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem Solving. Show your detailed solution. 1. From the figure below, estimate the time required for each activity, de

Post by answerhappygod »

Problem Solving Show Your Detailed Solution 1 From The Figure Below Estimate The Time Required For Each Activity De 1
Problem Solving Show Your Detailed Solution 1 From The Figure Below Estimate The Time Required For Each Activity De 1 (54.09 KiB) Viewed 37 times
Problem Solving. Show your detailed solution. 1. From the figure below, estimate the time required for each activity, determine the critical time and update the pert chart ACTIVITY DESCRIPTION PRECEDENCE <UA A B с D E F G 18 INITIAL DESIGN SURVEY MARKET BUILD PROTOTYPE TEST PROTOTYOE REDESIGNING MARKET TESTING SET UP PRODUCTION OPTIMISTIC MOST PESSIMISTIC EX TIME LIKELY TIME DL TIME 12 16 26 6 9 18 8 10 2 3 4 3 4 11 6 8 10 15 20 25 A A с BD E F 2 A-17 B-10 15 18 H G-20 2 5 6 C-11 D-3 3
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply