- Residential Construction Gantt Chart Create A Residential Construction Gantt Chart Using The Details For Each Items Of W 1 (75.65 KiB) Viewed 63 times
RESIDENTIAL CONSTRUCTION GANTT CHART Create a residential construction Gantt Chart using the details for each items of w
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
RESIDENTIAL CONSTRUCTION GANTT CHART Create a residential construction Gantt Chart using the details for each items of w
RESIDENTIAL CONSTRUCTION GANTT CHART Create a residential construction Gantt Chart using the details for each items of work below. You can create in an excel file OR through sketching in your bond paper. 1. Grading and Building Permits (4 days) 2. Site Work (7 days) 3. Foundation a. Layout Footings (1 day) b. Installation of Rebars (2 days) c. Footing Concreting (5 days) 4. Rough Carpentry a. Set Steel (1 day) b. Framing (7 days) c. Windows/Doors Installation (2 days) 5. Concrete Slab (7 days) 6. HVAC (14 days) 7.Facilities Rough-in (25 days) 8. Roofing (35 days) 9. Finish Exterior Work (30 days) 10. Floor Finishing (40 days) 11. Paint Works (37 days) 12. Final Punch-Out (5 days) 13. Construction close-out (1 day) *Notes: 1. It is not necessary that one activity should finish before proceeding to the next one. 2. Some activities may be performed with other activities at the same time. Some activities may happen at the same time with others. (For example: after 5 days of floor finishing, some may start painting works outside the building. 3. Put dates in your Gantt Chart 4. No work to be done on Sundays. 5. No work to be done on Saturdays.