Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A project is looking at the time it takes field teams to repair faults in air conditioning systems on customer sites. Fi

Post by answerhappygod »

A project is looking at the time it takes field teams to repairfaults in air conditioning systems on customer sites. Fiveconsecutive repair tasks were sampled every day for 20 days, andthe measured times in hour are shown in the following table.
task 1
task 2
task 3
task 4
task 5
3
4.9
4.5
6.8
4.8
4.4
4.1
4.2
5
5.2
5.1
3.8
3.6
4.5
5
5.6
6.5
4.9
6.2
6.9
4.7
4.2
5.3
3.2
6.7
5.7
6.3
5.1
3.7
5.1
4.9
4.1
4.2
4
6.7
4
6.1
4.6
6.1
3.2
6.4
3.2
3.5
5.6
5.4
5.8
3.8
3.1
3.8
6.2
3.8
6.6
5
3.2
4.2
3.4
4.7
6.1
6.1
5.6
5.2
3.2
6.3
6.7
3.4
4.8
6.6
4.3
3.2
6.1
4.5
6.2
5.9
4.8
4.5
4.6
4.2
6.9
6.6
6.2
3.8
3.7
5.8
5.4
3.2
5.3
3.5
6.8
6.8
6.4
5.1
3.2
4.8
4.6
5.2
5.7
5.9
6.9
3.8
5.3
Assume that 6 hours is the maximum allowable time by thecustomer. To avoid over-resourcing the repair teams are organizedso that it takes at least 3 hours to finish a repair task. Use thegiven data to: