What would be the average run length for a process that is in statistical control and the stopping rule in control chart
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
What would be the average run length for a process that is in statistical control and the stopping rule in control chart
What would be the average run length for a process that is in statistical control and the stopping rule in control charts that identifies 3 out the 6 consecutive points beyond the 1.8 standard deviation limits?