MJ Mining Company owns three mines and has three different types of ores that is mined. For each ore, the number of tons

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

MJ Mining Company owns three mines and has three different types of ores that is mined. For each ore, the number of tons

Post by answerhappygod »

Mj Mining Company Owns Three Mines And Has Three Different Types Of Ores That Is Mined For Each Ore The Number Of Tons 1
Mj Mining Company Owns Three Mines And Has Three Different Types Of Ores That Is Mined For Each Ore The Number Of Tons 1 (69.45 KiB) Viewed 33 times
Mj Mining Company Owns Three Mines And Has Three Different Types Of Ores That Is Mined For Each Ore The Number Of Tons 2
Mj Mining Company Owns Three Mines And Has Three Different Types Of Ores That Is Mined For Each Ore The Number Of Tons 2 (38.96 KiB) Viewed 33 times
MJ Mining Company owns three mines and has three different types of ores that is mined. For each ore, the number of tons per day available from each mine and the minimum number of tons required to fill orders are given in the following table. ORE TYPE Mine 2 Y 15 30 20 25 15 0 Daily Costs $6,600 $6,800 Iron Lead Nickel Mine 1 x Minimize Cost = subject to: Mine 3 2 15 0 10 $6,600 Let x,y, and z represent the number of days to run Mines 1, 2, and 3 respectively. Type the objective function and the left hand side of each constraint in the following answer boxes. 1480 Required tons 1480 1140 530

Minimize Cost = subject to: Number of days to run Mine 1 is Number of days to run Mine 2 is Use software to solve the linear program and enter the solution below. If there is no solution enter 'NONE' in all boxes below. Round days to two decimal places where necessary. Number of days to run Mine 3 is > 1480 Minimum cost is $ > 1140 2530