PR 8-1A Direct materials and direct labor variance analysis Obj. 2, 3 Direct labor time Abbeville Fixture Company manufa

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

PR 8-1A Direct materials and direct labor variance analysis Obj. 2, 3 Direct labor time Abbeville Fixture Company manufa

Post by answerhappygod »

Pr 8 1a Direct Materials And Direct Labor Variance Analysis Obj 2 3 Direct Labor Time Abbeville Fixture Company Manufa 1
Pr 8 1a Direct Materials And Direct Labor Variance Analysis Obj 2 3 Direct Labor Time Abbeville Fixture Company Manufa 1 (21.83 KiB) Viewed 16 times
Pr 8 1a Direct Materials And Direct Labor Variance Analysis Obj 2 3 Direct Labor Time Abbeville Fixture Company Manufa 2
Pr 8 1a Direct Materials And Direct Labor Variance Analysis Obj 2 3 Direct Labor Time Abbeville Fixture Company Manufa 2 (11.9 KiB) Viewed 16 times
PR 8-1A Direct materials and direct labor variance analysis Obj. 2, 3 Direct labor time Abbeville Fixture Company manufactures faucets in a small manufacturing facility. The faucets variance, 5600U are made from brass, Manufacturing has 90 employees. Each employee presently provides 36 hours of labor per week. Information about a production week is as follows: Standard wage perhe $15.00 Standard tabor time per faucet 40 min Standard number of lbs. of brass 3 lbs. Standard price per lb. of brass 52.40 Actual price per lb. of brass $2.50 Actuallbs of brass used during the week 14,350 lbs Number of faucets produced during the week Actual wage per hr $14.40 Actual hes for the week (90 employees x 36 hours) 3.240 (Continued) 4,800
408 Chapter 8 Evaluating wances from Standard Costs Instructions Determine (A) the standard cost per unit for direct materials and direct labor, (B) the direct materi- als price variance, direct materials quantity variance, and total direct materials cost variance; and the direct labor rate variance, direct labor time variance, and total direct labor cost variance
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply