An engineer conducted a site visit to a particular treatment plant. A measurement on the sedimentation tank is made in o

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

An engineer conducted a site visit to a particular treatment plant. A measurement on the sedimentation tank is made in o

Post by answerhappygod »

An engineer conducted a site visit to a particular treatmentplant. A measurement on the sedimentation tank is made in order toestimate the flow rate. The ratio of the depth of water to thewidth of the tank is 1:1.64, and the ratio of the width to thelength of the tank is 1:4. The surface loading, which is in m/day,is 0.30 times the surface area of the tank. The width of the tankis 4.1 m. Determine the dimension of the tank, the length of outletweir and its flow rate
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply