An articulated wheel loader equipped with a 4 LCY bucket is loading 4,966 LCY of gravel (loose material) from a stockpil

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

An articulated wheel loader equipped with a 4 LCY bucket is loading 4,966 LCY of gravel (loose material) from a stockpil

Post by answerhappygod »

An Articulated Wheel Loader Equipped With A 4 Lcy Bucket Is Loading 4 966 Lcy Of Gravel Loose Material From A Stockpil 1
An Articulated Wheel Loader Equipped With A 4 Lcy Bucket Is Loading 4 966 Lcy Of Gravel Loose Material From A Stockpil 1 (24.31 KiB) Viewed 77 times
An articulated wheel loader equipped with a 4 LCY bucket is loading 4,966 LCY of gravel (loose material) from a stockpile into rail cars. The one way travel distance is 300 ft. The area is level with a rolling resistance factor of 120 lb/ton. Job efficiency is estimated to be 50 minutes/hour. What would you estimate as the total cost to move this gravel if the hourly rate for the operator is $24 per hour, and the hourly rate for the loader is $59 per hour?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply