please help with explanations on TRIBUTARY LOADS , The coloured number a= 7m, b =3.5m ,d= 5m. No information is missing

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

please help with explanations on TRIBUTARY LOADS , The coloured number a= 7m, b =3.5m ,d= 5m. No information is missing

Post by answerhappygod »

please help with explanations on TRIBUTARY LOADS , The coloured number a= 7m, b =3.5m ,d= 5m. No information is missing
Please Help With Explanations On Tributary Loads The Coloured Number A 7m B 3 5m D 5m No Information Is Missing 1
Please Help With Explanations On Tributary Loads The Coloured Number A 7m B 3 5m D 5m No Information Is Missing 1 (69.01 KiB) Viewed 32 times
am Beam B-1 dm 2.1 Beam B-2, and Beam B-2 2.2 Girder G-1. Girder G-1 Open Girder G-2 bm Beam B-3. Girder G-1 supports Beam B-2 and Beam B-3. The concrete floor was poured on steel decking and is 160 mm thick. Use the loads given in the table to calculate the reactions on: d m Beam B-4 Load component Live load Concrete Steel decking Steel beams Steel girders Magnitude 2.3 2400 0.4 0.9 1.3 Unit kN/m² kg/m³ kN/m² kN/m kN/m
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply