(5 Marks) d) The Geotechnical Investigation was carried out with information provided in Table 1 below Depth Soil profil

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(5 Marks) d) The Geotechnical Investigation was carried out with information provided in Table 1 below Depth Soil profil

Post by answerhappygod »

5 Marks D The Geotechnical Investigation Was Carried Out With Information Provided In Table 1 Below Depth Soil Profil 1
5 Marks D The Geotechnical Investigation Was Carried Out With Information Provided In Table 1 Below Depth Soil Profil 1 (45.21 KiB) Viewed 37 times
Pleazzzz do question completelly dont do persal why u do pertial
(5 Marks) d) The Geotechnical Investigation was carried out with information provided in Table 1 below Depth Soil profile 0 2 4 6 8 9 10 12 14 0-4 0-4 QUESTIONT 6-12 Table 1. Gl for a proposed site Soil type Dry Sand Wet Sand Wet Clay Unit Weight SPT Point 18 kN/m² 18.5 kN/m² 19.0 kN/m² A B C D E N-Values 20 30 15 12-14 Wet Sand 19.5 kN/m i) Compute the corrected values of N and plot showing. . The variation of observed values with depth. ii) • The variation of corrected values with depth for standard energy 60%. Estimate the average angle of internal friction and relative density layers for 60% standard energy. 19 40 iii) For corrected values of Neo, determine the unconfined compressive clay at points C and D. What is consistency of clay Assume: E= 0.7, C=0.9, C,-0.9, and C=1.05 (4.5 Marks) for the sand strengths of (2 Marks) (2 Marks)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply