We don’t know how much of the reservoir was designed for sewage versus wastewater. Estimate the wastewater production pe
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
We don’t know how much of the reservoir was designed for sewage versus wastewater. Estimate the wastewater production pe
We don’t know how much of the reservoir was designed for sewageversus wastewater. Estimate the wastewater production per person inLondon if it was 10%, 20% or 50% sewage. Remember Crossness is onlysouth London and you can assume 30% of the population fed thesouthern outfall sewer around the time it was designed. Make anyother assumptions necessary.