For the given TC(Q)=0.005Q²+0.142Q+105.4 Minimize the average cost AC(Q). AC(Q)=0.005 + + AC(Q) can be rewritten with th

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

For the given TC(Q)=0.005Q²+0.142Q+105.4 Minimize the average cost AC(Q). AC(Q)=0.005 + + AC(Q) can be rewritten with th

Post by answerhappygod »

For The Given Tc Q 0 005q 0 142q 105 4 Minimize The Average Cost Ac Q Ac Q 0 005 Ac Q Can Be Rewritten With Th 1
For The Given Tc Q 0 005q 0 142q 105 4 Minimize The Average Cost Ac Q Ac Q 0 005 Ac Q Can Be Rewritten With Th 1 (20.93 KiB) Viewed 55 times
For The Given Tc Q 0 005q 0 142q 105 4 Minimize The Average Cost Ac Q Ac Q 0 005 Ac Q Can Be Rewritten With Th 2
For The Given Tc Q 0 005q 0 142q 105 4 Minimize The Average Cost Ac Q Ac Q 0 005 Ac Q Can Be Rewritten With Th 2 (18.92 KiB) Viewed 55 times
For The Given Tc Q 0 005q 0 142q 105 4 Minimize The Average Cost Ac Q Ac Q 0 005 Ac Q Can Be Rewritten With Th 3
For The Given Tc Q 0 005q 0 142q 105 4 Minimize The Average Cost Ac Q Ac Q 0 005 Ac Q Can Be Rewritten With Th 3 (25.74 KiB) Viewed 55 times
For the given TC(Q)=0.005Q²+0.142Q+105.4 Minimize the average cost AC(Q). AC(Q)=0.005 + + AC(Q) can be rewritten with the last term in power notation as: AC(Q)=0.005 + + X
Optimization: 1. AC'(Q)= + X AC'(Q)=0 and solve. Accepted critical value: Q= round to 1 d.p. 2. AC"(Q)= X AC" (c.v.)=AC" (
)= Select the correct response: O<0 Min O>0 Max O>0 Min O<0 Max 3. Minimum Average Cost ACMin is: $ round to the nearest cent.