Write a Mathlab program that can solve for the water flow rate distribution in a network of pipes using Hardy Cross Meth

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Write a Mathlab program that can solve for the water flow rate distribution in a network of pipes using Hardy Cross Meth

Post by answerhappygod »

Write A Mathlab Program That Can Solve For The Water Flow Rate Distribution In A Network Of Pipes Using Hardy Cross Meth 1
Write A Mathlab Program That Can Solve For The Water Flow Rate Distribution In A Network Of Pipes Using Hardy Cross Meth 1 (15.46 KiB) Viewed 42 times
Write A Mathlab Program That Can Solve For The Water Flow Rate Distribution In A Network Of Pipes Using Hardy Cross Meth 2
Write A Mathlab Program That Can Solve For The Water Flow Rate Distribution In A Network Of Pipes Using Hardy Cross Meth 2 (29.37 KiB) Viewed 42 times
use table 1 if you zoom in you could see the numbers. for some reason its blurry
Write a Mathlab program that can solve for the water flow rate distribution in a network of pipes using Hardy Cross Method capable of handling a maximum of ten loops with a maximum of ten lines in each loop. The program has to use Hazen Williams Equation for major pipe losses and symbols given on page 2.
1 3 1234 1 2 3 4 1234 TABLE 1 Loop Line Length Diameter Q() No. No. (in.) (efs) 3 1234 4.0 10.8 cfs 3.8 10560 15840 10560 16 15840 62496 A typical three-loop network. 12 14 16 6426 15840 16 13200 14 10560 12 10560 16 2022 2.4 cfs 15840 12 15840 10 1.M 15840 12 15840 12 Loop 1 42.3 cfs Loo 3.0 1.5 -4.0 3.8 1.7 0.3 -3.0 1.8 0.4 -1.0 -1.5 2.1 of 10.3 Loep 3 1 1.4 cs AEHAS BUDMA TABLE 2 Loop Node Line Swamer-Jain No No. 1 2 3 4 E44E 1234 1.4 cfs 1.4 cts Q (ef) 3.780 1.506 -1.640 14.040 2.980 0.880 -0.520 -3.780 1,753 0.353 <-1.047 -1.508 H (f) 120.000 102.902 84.085 90.816 120.000 select: 120.000 103.823 101.244 102.902 120.000 Cast Iron Pipe 102.902 77.730 74.734 84.085 102.902 60.00085 fr Y=1.082X16 $=8 2=10 S_1+1=3 QBA =-40 cfs Roc=+3.8 cts H--1.5 cfs
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply