(b) In a two-area power system, Area-1 is exporting power over a tie line to Area-2. If the load changes in the two area
Posted: Fri Jul 08, 2022 6:27 am
(b) In a two-area power system, Area-1 is exporting power over a tie line to Area-2. If the load changes in the two areas respectively by APL1and APL2 show that the change in angular frequency under steady state condition is: -APL1 - APL2 Afss [D₁ + R²₂] + [D₂ + 7²₂] Show any block diagram used in your derivation. All the symbols have their usual significance.