(b) In a two-area power system, Area-1 is exporting power over a tie line to Area-2. If the load changes in the two area

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(b) In a two-area power system, Area-1 is exporting power over a tie line to Area-2. If the load changes in the two area

Post by answerhappygod »

B In A Two Area Power System Area 1 Is Exporting Power Over A Tie Line To Area 2 If The Load Changes In The Two Area 1
B In A Two Area Power System Area 1 Is Exporting Power Over A Tie Line To Area 2 If The Load Changes In The Two Area 1 (16.4 KiB) Viewed 47 times
please send the answer as fast as can power operation system
(b) In a two-area power system, Area-1 is exporting power over a tie line to Area-2. If the load changes in the two areas respectively by APL1and APL2 show that the change in angular frequency under steady state condition is: -APL1 - APL2 Afss [D₁ + R²₂] + [D₂ + 7²₂] Show any block diagram used in your derivation. All the symbols have their usual significance.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply