questions below. i) Name one example of distributed generation (DG) technology ii) Plot with scale the magnitude (p.u) vs duration (s) for the above PQ disturbance iii) Describe the effects of fault to both customers
Transformer WW Customer 2 DG Circuit breaker WW Customer 1
A part of single line for small industrial area in eastern Malaysia shown in Figure 4. Some underground maintenance work conducted by a contractor in the area resulted with line to ground fault at bus 1 causing sustained interruption from 10 (h):20 (m):30 (s) to 10 (h):25 (m):50 (s). Answer A part of single line for small industrial area in eastern Malaysia shown in Figure 4. Some underground maintenance work
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am