- 1 You Are Hired To Install 30m Long 0 5m Diameter Concrete Piles In A Sand Deposit With The Following Parameters Y 1 (9.88 KiB) Viewed 47 times
1 - You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y =
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
1 - You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y =
1 - You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y = 18.0kN/m² ² = 32 degrees 8' = 0.70 K = 1.5K Using equations 12.18, 12.42 and 12.43 find Q, and Q, for this pile.