6. For the figures shown, calculate how many cubic yards of concrete are needed to construct the continuous footing and

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

6. For the figures shown, calculate how many cubic yards of concrete are needed to construct the continuous footing and

Post by answerhappygod »

6 For The Figures Shown Calculate How Many Cubic Yards Of Concrete Are Needed To Construct The Continuous Footing And 1
6 For The Figures Shown Calculate How Many Cubic Yards Of Concrete Are Needed To Construct The Continuous Footing And 1 (44.8 KiB) Viewed 60 times
6. For the figures shown, calculate how many cubic yards of concrete are needed to construct the continuous footing and include 10% of waste for concrete material, and how many lineal feet of forms are needed to construct the continuous footing. Calculate how many cubic yards of concrete are needed to construct the wall and include 12% of waste for concrete material and how many square feet of forms are needed to construct the wall. 22-0 Wall Section 20'-8" 16-0" 14-8" 26-8 28¹-0 2 x 4 WALL WITH 7/16" OSB- 5/8 X 10" ANCHOR BOLT@32" 0.c. #4 REBAR @ 12 O.C. BOTH WAYS #5 DOWELS 12" O.C. ALTERNATING DIRECTIONS- 8-4 2 EACH #4 REBAR TOP AND BOTTOM 3 EACH #4 CONT. REBAR- -2-0 8-4 12-0 12-4 24-0" 13-0 12-0 0-8