3. Prepare a conceptual cost estimate for a proposed building with 90,500 sf. The building will be built 4 years from no

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

3. Prepare a conceptual cost estimate for a proposed building with 90,500 sf. The building will be built 4 years from no

Post by answerhappygod »

3 Prepare A Conceptual Cost Estimate For A Proposed Building With 90 500 Sf The Building Will Be Built 4 Years From No 1
3 Prepare A Conceptual Cost Estimate For A Proposed Building With 90 500 Sf The Building Will Be Built 4 Years From No 1 (31.65 KiB) Viewed 47 times
3. Prepare a conceptual cost estimate for a proposed building with 90,500 sf. The building will be built 4 years from now in City B. A similar building with 110,000 square feet was completed last year in City D and cost $10,450,000. The equivalent compound interest rate is 1.83%. Which of the adjustments - time, location, or size has the most significant impact on the estimate? Location Index City A 1025 City B 1170 City C 1260 City D 1240
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply