PV System System size to install= 1 MWp System life = 30 years Cost = 1 JD/Wp Utilization Factor = 21% Dust cleaning cos

Posted: Sun Apr 17, 2022 7:01 pm
by answerhappygod
PV System
System size to install= 1 MWp System life = 30 years Cost = 1
JD/Wp Utilization Factor = 21% Dust cleaning cost = 250
JD/month
Calculate LCOE?
Wind System1.5 MW turbine UF = 50%Cost of turbine = 1000
JD/kWO&M cost = 20 JD/kW/year System life = 25 years
Pv System System Size To Install 1 Mwp System Life 30 Years Cost 1 Jd Wp Utilization Factor 21 Dust Cleaning Cos 1
Pv System System Size To Install 1 Mwp System Life 30 Years Cost 1 Jd Wp Utilization Factor 21 Dust Cleaning Cos 1 (8.25 KiB) Viewed 29 times
HW: Solve both questions for PV and wind systems with the assumption of 10% discount rate