PV System System size to install= 1 MWp System life = 30 years Cost = 1 JD/Wp Utilization Factor = 21% Dust cleaning cos

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

PV System System size to install= 1 MWp System life = 30 years Cost = 1 JD/Wp Utilization Factor = 21% Dust cleaning cos

Post by answerhappygod »

PV System
System size to install= 1 MWp System life = 30 years Cost = 1
JD/Wp Utilization Factor = 21% Dust cleaning cost = 250
JD/month
Calculate LCOE?
Wind System1.5 MW turbine UF = 50%Cost of turbine = 1000
JD/kWO&M cost = 20 JD/kW/year System life = 25 years
Pv System System Size To Install 1 Mwp System Life 30 Years Cost 1 Jd Wp Utilization Factor 21 Dust Cleaning Cos 1
Pv System System Size To Install 1 Mwp System Life 30 Years Cost 1 Jd Wp Utilization Factor 21 Dust Cleaning Cos 1 (8.25 KiB) Viewed 28 times
HW: Solve both questions for PV and wind systems with the assumption of 10% discount rate