The standard cost of product 2525 includes 3.20 hours of direct labour at $14.15 per hour. The predetermined overhead ra

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The standard cost of product 2525 includes 3.20 hours of direct labour at $14.15 per hour. The predetermined overhead ra

Post by answerhappygod »

The Standard Cost Of Product 2525 Includes 3 20 Hours Of Direct Labour At 14 15 Per Hour The Predetermined Overhead Ra 1
The Standard Cost Of Product 2525 Includes 3 20 Hours Of Direct Labour At 14 15 Per Hour The Predetermined Overhead Ra 1 (20.16 KiB) Viewed 30 times
The standard cost of product 2525 includes 3.20 hours of direct labour at $14.15 per hour. The predetermined overhead rate is $20.90 per direct labour hour. During July, the company incurred 7,780 hours of direct labour at an average rate of $14.45 per hour and $157,612 of manufacturing overhead costs. It produced 2,400 units. (a) Your answer is correct. Calculate the total, price, and quantity variances for labour. $ 3749 Total labour variance Unfavourable $ 2334 Labour price variance Unfavourable $ 1415 MB Labour quantity variance Unfavourable
Your answer is partially correct. Calculate the total overhead variance. $ $ 4990 Favourable Total overhead variance <