0.14x 0.14x dollars per day A construction company has an expenditure rate of E'(x) = e dollars per day on a particular

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

0.14x 0.14x dollars per day A construction company has an expenditure rate of E'(x) = e dollars per day on a particular

Post by answerhappygod »

0 14x 0 14x Dollars Per Day A Construction Company Has An Expenditure Rate Of E X E Dollars Per Day On A Particular 1
0 14x 0 14x Dollars Per Day A Construction Company Has An Expenditure Rate Of E X E Dollars Per Day On A Particular 1 (68.57 KiB) Viewed 11 times
For a) round to nearest integer at the end as needed.
for b-d) round to the nearest cent as needed at the end.
*7.57
0.14x 0.14x dollars per day A construction company has an expenditure rate of E'(x) = e dollars per day on a particular paving job and an income rate of l'(x) = 117.4 - e on the same job, where x is the number of days from the start of the job. The company's profit on that job will equal total income less total expenditures. Profit will be maximized if the job ends at the optimum time, which is the point where the two curves meet. (a) Find the optimum number of days for the job to last. (b) Find the total income for the optimum number of days. (c) Find the total expenditures for the optimum number of days. (d) Find the maximum profit for the job.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply