Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo,

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo,

Post by answerhappygod »

Brawdy Plastics Inc Produces Plastic Seat Belt Retainers For General Motors At The Brawdy Plastics Plant In Buffalo 1
Brawdy Plastics Inc Produces Plastic Seat Belt Retainers For General Motors At The Brawdy Plastics Plant In Buffalo 1 (19.03 KiB) Viewed 6 times
Brawdy Plastics Inc Produces Plastic Seat Belt Retainers For General Motors At The Brawdy Plastics Plant In Buffalo 2
Brawdy Plastics Inc Produces Plastic Seat Belt Retainers For General Motors At The Brawdy Plastics Plant In Buffalo 2 (12.66 KiB) Viewed 6 times
Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. Line Speed 20 20 30 30 40 40 50 50 Number of Defective Parts Found 23 22 19 15 14 17 15 11
(c) Use the least squares method to develop the estimated regression equation. ŷ = (d) Predict the number of defective parts found for a line speed of 35 feet per minute.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply