1. (10 points) A building has a 1000-ton chilled water plant (CWP). The system is water-cooled through a cooling tower.
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
1. (10 points) A building has a 1000-ton chilled water plant (CWP). The system is water-cooled through a cooling tower.
1. (10 points) A building has a 1000-ton chilled water plant (CWP). The system is water-cooled through a cooling tower. Assume 1.5% of the total cooling water is lost through evaporation in the cooling tower. How much makeup water (in GPM) should be provided for this system?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!