The Quality Manager at Bolton Building Supply wants to build a control chart that will help to detect if the production

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The Quality Manager at Bolton Building Supply wants to build a control chart that will help to detect if the production

Post by answerhappygod »

The Quality Manager At Bolton Building Supply Wants To Build A Control Chart That Will Help To Detect If The Production 1
The Quality Manager At Bolton Building Supply Wants To Build A Control Chart That Will Help To Detect If The Production 1 (38.77 KiB) Viewed 11 times
The Quality Manager at Bolton Building Supply wants to build a control chart that will help to detect if the production process has a shift of the process mean. She has gathered the following data. Samples 2 4.6 4.5 44 2 1 4.5 4.2 4.3 4.3 4.7 43 4.2 4.3 43 Determine the UCL & LCL for this process given the data provided. Note: The Table for A2, D3 and D4 should show imbedded below. It can also be found in your textbook or PPT slide deck (assuming you printed it). Control Chart Factors (Table S6.1) Sample Size Mean Factor Upper Range Lower Range n A₂ D₁ D₂ 3 4 5 6 7 8 3 4.5 4.6 44 9 10 12 4 4.7 4.6 4.8 4.5 4.9 44 4.6 4.3 1.880 1.023 0.729 0.577 0.483 0.419 0.373 0.337 0.308 0.266 3.268 2.574 2.282 2.115 2.004 1.924 1.864 1.816 1.777 1.716 0 0 0 0 0 0.076 0.136 0.184 0.223 0.284
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply