Nathan's Novelty Books is an industrial printer of fictional romance novels. Each book that gets produced goes through 4

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Nathan's Novelty Books is an industrial printer of fictional romance novels. Each book that gets produced goes through 4

Post by answerhappygod »

Nathan S Novelty Books Is An Industrial Printer Of Fictional Romance Novels Each Book That Gets Produced Goes Through 4 1
Nathan S Novelty Books Is An Industrial Printer Of Fictional Romance Novels Each Book That Gets Produced Goes Through 4 1 (32.3 KiB) Viewed 8 times
Nathan's Novelty Books is an industrial printer of fictional romance novels. Each book that gets produced goes through 4 different manufacturing workstations. Nathan's organization has embarked on a journey of implementing lean manufacturing. and has already transitioned from batch processing to single piece flow. This helped the organization improve productivity by 45%. After a recent kaizen event, the manufacturing team was able to make additional improvements. They removed some unnecessary processing steps from the workstation with a bottleneck, and that resulted in a removal of 5 seconds of processing time per item from that specific workstation. Given this improvement, what is the new total time it takes to build the entire batch of 100 books? Workstation A B с D O 3.035 seconds 65 seconds O 1 minute 10 minutes 2.535 seconds Batch Size (Q) 100 100 100 100 Processing Time per Item (in seconds) 10 30 15 10
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply