6- The data about the assembly of a product is given as in the following table. It is desired: element Time (minutes) A

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

6- The data about the assembly of a product is given as in the following table. It is desired: element Time (minutes) A

Post by answerhappygod »

6 The Data About The Assembly Of A Product Is Given As In The Following Table It Is Desired Element Time Minutes A 1
6 The Data About The Assembly Of A Product Is Given As In The Following Table It Is Desired Element Time Minutes A 1 (72.43 KiB) Viewed 9 times
6- The data about the assembly of a product is given as in the following table. It is desired: element Time (minutes) A B с D E F G H 3 2 2 2 2 5 4 1 First prerequisite A B D Ꭰ E C,G,F a. The cycle time (in minutes) if we desire to produce 24000 units of the product during one working year (each year is assumed to be 300 working days, each working day to be 8 hours) b. The number of stations and elements in each using RPW method c. The balance efficiency with two digits after the decimal
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply