The assembly-line activities are given as follows for the manufacturing of a product Performance Time (mins) 7 Task A B

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The assembly-line activities are given as follows for the manufacturing of a product Performance Time (mins) 7 Task A B

Post by answerhappygod »

The Assembly Line Activities Are Given As Follows For The Manufacturing Of A Product Performance Time Mins 7 Task A B 1
The Assembly Line Activities Are Given As Follows For The Manufacturing Of A Product Performance Time Mins 7 Task A B 1 (37.39 KiB) Viewed 34 times
The assembly-line activities are given as follows for the manufacturing of a product Performance Time (mins) 7 Task A B Fig. 1 Predecessors Fig. 2 A B B Task E F G H Performance Time (mins) 7 1 For a given 7-minute cycle time after allowances, the theoretical minimum number of workstations= (round your response to the immediate-higher whole number) The correct precedence relationship with one of the possible assignment of tasks to workstations for the 7-minute cycle time is shown in Fig. 3 Fig. 3 Predecessors с C D, E, F G Q The operating efficiency of the assembly line using 5 workstations 91.43 % (enter your response as a percentage rounded to two decimal places).
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply