Question 16
The ______ is (are) the MRP input detailing which end items areto be produced, when they are needed, and in what quantities.
Group of answer choices
Inventory records
Gross requirement
Assembly time chart
Master production schedule
Bill of materials
Question 17
For a set of tasks, sequencing them using shortest processingtime rule (SPT) results in:
Average Flow = 18 hours
Average Tardy = 3 hours
Sequencing them using first come first serve rule (FCFS) resultsin:
Average Flow = 16 hours
Average Tardy = 5 hours
Which one of the following statement is NOT true?
Group of answer choices
SPT is slower than FCFS based on Average Flow.
SPT and FCFS each has its own merits.
FCFS is not absolutely better than SPT in this case.
SPT hands-down outperforms FCFS in this case.
FCFS exceeds due time more than SPT does.
Question 18
What is this system's reliability ?
Group of answer choices
95.06%
292.6%
74%
83.79%
92.78%
Flag question: Question 19
Question 192 pts
Flow time in sequencing represents the time
Group of answer choices
An order spends being processed at a work center
None of the others
To complete an order, including time spent in processing and inwaiting
An order spends moving from one work center to another
An order spends waiting for processing at a work center
Flag question: Question 20
Question 202 pts
Short-term schedules are prepared
Group of answer choices
From the purchasing plans
From master schedules which are derived from aggregate plans
Directly from the aggregate plans
Directly from the capacity plans
From inventory records for items that have been used up
Flag question: Question 21
Question 212 pts
Given the following bill of materials
If the demand for product A is 50 units, what will be the grossrequirement for component E?
Group of answer choices
300
250
200
4
100
Flag question: Question 22
Question 222 pts
A method of input-output control that uses a system of cards tolimit the amount of work at a work center and also to control leadtime and monitor backlog is
Group of answer choices
Forward scheduling
Leve material use
The assignment method
Backward scheduling
Constant work in process or ConWIP
Flag question: Question 23
Question 232 pts
Which one of the statements concerning sequencing rules isINCORRECT?
Group of answer choices
Shortest processing time rule gets long jobs done as early aspossible.
Shortest processing time rule tends to minimize flow time in thesystem.
Earliest due date rule tends to minimize lateness.
No one sequencing rule excels on all criteria.
First come first serve rule is perceived to be fair bycustomers.
Flag question: Question 24
Question 242 pts
Which one of the following statements is INCORRECT regarding aGantt Chart?
Group of answer choices
Monitors jobs in process.
Needs to be updated frequently.
Shows the loading and idle time of a department.
Displays relative workloads over time.
Determines directly which sequence rule is the best for asequencing task.
Flag question: Question 25
Question 252 pts
Which of the following dispatching rules ordinarily gives thebest results when the criterion is lowest time for completion ofthe full sequence of jobs?
Group of answer choices
Shortest processing time (SPT)
Longest processing time
Critical ratio (CR)
First in, first out (FIFO)
First come, first served (FCFS)
Flag question: Question 26
Question 262 pts
A bakery operates a baking line with 3 machines , one 8 hourshift, 85% efficiency, and 90% utilization, what is the bakery'scapacity?
Hint: # of machines x # of shifts x hours/shift x efficiency xutilization = capacity
Group of answer choices
6.12 hours
11 hours
20.4 hours
21.26 hours
18.36 hours
Flag question: Question 27
Question 272 pts
A system with two assembly lines has a capacity of 1920 minutesper day. On Monday, it is actual load is 1440 minutes. What is thesystem's load percentage?
Group of answer choices
75%
98%
24%
133%
50%
Flag question: Question 28
Question 282 pts
What are K-Bills in Bill of Materials?
Group of answer choices
They are used for small and loose parts, such as fasteners,nuts, and bolts.
They are normally product procurement bills sent by Koreantrading partners.
They are transient subassemblies immediately consumed in thenext stage.
They are major integral components such as engines andtransmissions of a vehicle.
They are K shaped components that are often hard toassemble.
Flag question: Question 29
Question 292 pts
Lowest level coding in bill of materials means that:
Group of answer choices
None of the others
It is the code for the lowest level in the BOM structure
A final item has only a few levels in the BOM structure
The top level of the BOM is below level zero and that BOMs arenot organized around the finished product
A component item is coded at the lowest level at which itappears in the BOM structure
Flag question: Question 30
Question 302 pts
In capacity requirement planning, which one of the followingstatements concerning capacity calculation is RIGHT?
Group of answer choices
Load percentage shows what percentage of your capacity isactually used.
Number of machines or workers don't need to be considered.
Utilization shall not be allowed to be lower than 85%.
Load percentage will never exceed 100%.
Capacity efficiency is always 100%.