Question 1 20 points Save Answer Latdril Company manufactures five parts that require the use of a lathe and a drill pre

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 1 20 points Save Answer Latdril Company manufactures five parts that require the use of a lathe and a drill pre

Post by answerhappygod »

Question 1 20 Points Save Answer Latdril Company Manufactures Five Parts That Require The Use Of A Lathe And A Drill Pre 1
Question 1 20 Points Save Answer Latdril Company Manufactures Five Parts That Require The Use Of A Lathe And A Drill Pre 1 (55.97 KiB) Viewed 12 times
Please show goal constraints, system constraints, objective function
Question 1 20 points Save Answer Latdril Company manufactures five parts that require the use of a lathe and a drill press. The two machines operate 12 hours a day. The following table provides the time in minutes required by each part: Part 1 2 3 4 5 Production time (in minutes) Lathe Drill Press 5 5 8 14 3 6 14 Below are the priority goals of the company:

Below are the priority goals of the company: Priority Goal 1: Production time for both machines should at most 12 hours. Priority Goal 2: Balance the two machines by limiting the difference between their total operation times to at most 45 minutes. Priority Goal 3: The market demand for each part is at least 12 units. Priority Goal 4: The number of units of Part 1 may not exceed that of Part 2. Formulate the problem as a goal programming model.