Assume the following: • The variable portion of the predetermined overhead rate is $1.50 per direct labor-hour. • The st

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Assume the following: • The variable portion of the predetermined overhead rate is $1.50 per direct labor-hour. • The st

Post by answerhappygod »

Assume The Following The Variable Portion Of The Predetermined Overhead Rate Is 1 50 Per Direct Labor Hour The St 1
Assume The Following The Variable Portion Of The Predetermined Overhead Rate Is 1 50 Per Direct Labor Hour The St 1 (70.81 KiB) Viewed 16 times
Assume the following: • The variable portion of the predetermined overhead rate is $1.50 per direct labor-hour. • The standard labor-hours allowed per unit of finished goods is 3 hours. • The actual quantity of labor hours worked during the period was 43,350 hours. • The total actual variable manufacturing overhead cost for the period was $63,000. • The company produced 15,000 units of finished goods during the period. What is the variable overhead rate variance?

Multiple Choice O O $2,025 F $2,025 U $4,500 U $4,500 F
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply