- Thanos Manufacturing Has 12 100 Labor Hours Available For Producing A And B Consider The Following Information Product 1 (13.95 KiB) Viewed 8 times
Thanos Manufacturing has 12,100 labor hours available for producing A and B. Consider the following information: Product
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Thanos Manufacturing has 12,100 labor hours available for producing A and B. Consider the following information: Product
Thanos Manufacturing has 12,100 labor hours available for producing A and B. Consider the following information: Product A Product B Required labor time per unit (hours) 4 3 Maximum demand (units) 3,000 Contribution margin per unit $13.50 If Thanos follows proper managerial accounting practices in terms of setting a production schedule, how many units of product A should it produce? (Do not round intermediate calculations. Round the final answer to the nearest whole number.) 2,500 $16.00