c) The two steps in preparing metal die are casting processes and precision machining. Personal fatigue and delay allowa

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

c) The two steps in preparing metal die are casting processes and precision machining. Personal fatigue and delay allowa

Post by answerhappygod »

C The Two Steps In Preparing Metal Die Are Casting Processes And Precision Machining Personal Fatigue And Delay Allowa 1
C The Two Steps In Preparing Metal Die Are Casting Processes And Precision Machining Personal Fatigue And Delay Allowa 1 (66.02 KiB) Viewed 10 times
c) The two steps in preparing metal die are casting processes and precision machining. Personal fatigue and delay allowances are set at 15%. The casting machine operator is rated at 110% and the precision machinist is rated at 80%. Observed times per batch are given below in Table 3. Determine the standard time for the task. Discuss the result. Observed Time in Minutes 2 3 130 65 Table 3: Observed Times Per Batch 1 Task Casting Processes 120 Precision Machining 55 110 55 (5 Marks) 4 120 65 d) Discuss three (3) waste or "MUDA" that possibly can happen in Dayang Cast Sdn. Bhd. (6 Marks)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply