1. a. Given the following diagram for a product, determine the quantity of each component required to assemble one unit
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
1. a. Given the following diagram for a product, determine the quantity of each component required to assemble one unit
1. a. Given the following diagram for a product, determinethe quantity of each component required to assemble one unit of thefinished product. b. Draw a tree diagram for a stapler, given the following bill ofmaterials: 2. The following table lists the components needed to assemble anend item, lead times, and quantities on hand. a. If 20 units of the end item are to be assembled, how manyadditional units of E are needed? (Hint: You don’t need to developan MRP plan to determine this.) b. An order for the end item is scheduled to be shipped atthe start of week 11. What is the latest week that the order can bestarted and still be ready to ship on time? (Hint: You don’t needto develop an MRP plan for this part either.) 3. The following table lists the components needed toassemble an end item, lead times (in weeks), and quantities onhand.EF (2) GHJ (2) D (4) L (2) J (2) D (2) A (4)Item Components Stapler Top assembly, base assembly Top assemblyCover, spring, slide assembly Cover Spring Slide assembly Slide, spring Slide Spring Base assembly Base, strike plate, rubber pad (2)Base Strike plate Rubber pad