- Tri Bikes Manufactures Two Different Levels Of Bicycles The Standard And The Extreme The Total Overhead Of 300 000 Ha 1 (39.38 KiB) Viewed 13 times
Tri-bikes manufactures two different levels of bicycles: the Standard and the Extreme. The total overhead of $300,000 ha
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Tri-bikes manufactures two different levels of bicycles: the Standard and the Extreme. The total overhead of $300,000 ha
Tri-bikes manufactures two different levels of bicycles: the Standard and the Extreme. The total overhead of $300,000 has traditionally been allocated by direct labor hours, with 170,000 hours for the Standard and 30,000 hours for the Extreme. After analyzing and assigning costs to two cost pools, it was determined that machine hours is estimated to have $200,000 of overhead, with 4,000 hours used on the Standard product and 1,000 hours used on the Extreme product. It was also estimated that the setup cost pool would have $100,000 of overhead, with 1,000 hours for the Standard and 1,500 hours for the Extreme. What is the overhead rate per product, under traditional and under ABC costing? Traditional ABC Overhead per Standard product $ Overhead per Extreme product $ LA