Consider the following figure. ii. 0.4 0.35 iii. 0.3 0.25 0.2 0.15 0.1 0.05 0 II Solar PV (b) Figure 1 The Levelized Cos

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Consider the following figure. ii. 0.4 0.35 iii. 0.3 0.25 0.2 0.15 0.1 0.05 0 II Solar PV (b) Figure 1 The Levelized Cos

Post by answerhappygod »

Consider The Following Figure Ii 0 4 0 35 Iii 0 3 0 25 0 2 0 15 0 1 0 05 0 Ii Solar Pv B Figure 1 The Levelized Cos 1
Consider The Following Figure Ii 0 4 0 35 Iii 0 3 0 25 0 2 0 15 0 1 0 05 0 Ii Solar Pv B Figure 1 The Levelized Cos 1 (124.14 KiB) Viewed 10 times
Consider the following figure. ii. 0.4 0.35 iii. 0.3 0.25 0.2 0.15 0.1 0.05 0 II Solar PV (b) Figure 1 The Levelized Cost of Electricity Generation In figure 1, a private considers two options for electricity generation. Suppose the levelized private (or direct) cost (in S) for one KWh of electricity from solar PV is $0.35, in comparison to the levelized private cost (in $) for one KWh of electricity from a combined- cycle-gas-fired electricity plant is $0.08. Combined-cycle gas-fired External cost Private cost The social cost = the private cost + the external cost !! Consideration is also given to the following: (a) the gas-fired electricity generation produces Carbon dioxide emissions which contributes to global warming. LCOE= The levelized cost estimates are based on discounting. The levelized cost of electricity LCOE are defined as: 1-Ĺ4 yxa+Σa 1¹ ×(1-0)-ST T η Σχαι Based on the scenario, answer the following questions: i. The factor y represents the time-value of money [y = 1/(1+r)], r is the discount rate. a is the corporate tax rate, n is the energy production, and T is the life-cycle of the project. From the prima facie scenario, which option appears to be more costly and hence less efficient / attractive? Consider that the rate of discount used in figure 1 is 3%. What will happen to the private cost of solar PV if the rate of discount is lower to 1% and 3% respectively. Based on your findings how crucial is the discount rate in LCOE?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply