7.5 m B 2.5 m 6 m $₂ S₁ 7m S3 Lift shaft 8m S₁ Ss S6 LL = 3 KPa Floor Finishes = 1.20 KPa fe'= 20.7 MPa fy=276 MPa Main

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

7.5 m B 2.5 m 6 m $₂ S₁ 7m S3 Lift shaft 8m S₁ Ss S6 LL = 3 KPa Floor Finishes = 1.20 KPa fe'= 20.7 MPa fy=276 MPa Main

Post by answerhappygod »

7 5 M B 2 5 M 6 M S 7m S3 Lift Shaft 8m S Ss S6 Ll 3 Kpa Floor Finishes 1 20 Kpa Fe 20 7 Mpa Fy 276 Mpa Main 1
7 5 M B 2 5 M 6 M S 7m S3 Lift Shaft 8m S Ss S6 Ll 3 Kpa Floor Finishes 1 20 Kpa Fe 20 7 Mpa Fy 276 Mpa Main 1 (25.27 KiB) Viewed 20 times
7.5 m B 2.5 m 6 m $₂ S₁ 7m S3 Lift shaft 8m S₁ Ss S6 LL = 3 KPa Floor Finishes = 1.20 KPa fe'= 20.7 MPa fy=276 MPa Main 12 db & Temp 10 db Design Completely WSD S1, S2, & 53 USD 54, 55, & $6 2m 1.5 m
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply