A team of engineers would like to determine the waverunup for a quarrystone breakwater with the followingconditions:
The team would like to reduce the wave runup by usingeither a tetrapod or tribar concrete armor in place of thequarrystone. For the given conditions above, determine whether theengineers can achieve their goal and by what percentage would youexpect runup to be reduced for the tetrapod and tribar armors.
A team of engineers would like to determine the wave runup for a quarrystone breakwater with the following conditions: T
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am