→ DESIGN OF TIMBER FLOOK PRAMINE SYSTEM PROPORTION OF FLOOK TRAMING DAN SUB A PL GELL = L DEAD: DESIGN THE PF: () WERD P

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

→ DESIGN OF TIMBER FLOOK PRAMINE SYSTEM PROPORTION OF FLOOK TRAMING DAN SUB A PL GELL = L DEAD: DESIGN THE PF: () WERD P

Post by answerhappygod »

Design Of Timber Flook Pramine System Proportion Of Flook Traming Dan Sub A Pl Gell L Dead Design The Pf Werd P 1
Design Of Timber Flook Pramine System Proportion Of Flook Traming Dan Sub A Pl Gell L Dead Design The Pf Werd P 1 (49.89 KiB) Viewed 13 times
→ DESIGN OF TIMBER FLOOK PRAMINE SYSTEM PROPORTION OF FLOOK TRAMING DAN SUB A PL GELL = L DEAD: DESIGN THE PF: () WERD PLOTE JOIST SPACED @ 0.500 0.C. (2) WOOD GORDER G-2 USE= Fr=3m², The E= 12,000~ Ses = 10 kallo³ Sacow: Yeta ust user 2001:2015 8 CM SOLUTION: STEP 1 LOAD AJAL W₁² (4+2) 0.50 = 80 k Wors= 1-2 (18) 2-16 taglay = 2:20 kalfom STEP 2 LOAD@G-R Po 1-922 1m F₁ FA =1922(0)/2 = 0.961 LOAD @ CA-1 1.922 0.961+ 0-833 3m ↑ F3 +1922(3)/ -4.665 - 3844 KN JOST @ 0.1m = 3/03410 141 JOUT 04m = 1/03 6-6700 7 JOHT 29-241 km For 4 LOAD @ G-3 4m W3 = ? 3m Ľ 3 FE AX R₂ La= 5mm. p ca R₂ 2m +34 WED SPACED & 0.70m. 0.2. Ly - Zm R₁ : 2 (Rat K₂) 3 904 (++) C Cel 16-1 + be + -20-969 bal * «L« + $$45&#15૨૦ મિન ky/20181/2-10.099 bala G
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply