9. A large building is taking 3-phase supply from utility at LV i.e. 400 V. After adding capacitors at the intake point

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

9. A large building is taking 3-phase supply from utility at LV i.e. 400 V. After adding capacitors at the intake point

Post by answerhappygod »

9 A Large Building Is Taking 3 Phase Supply From Utility At Lv I E 400 V After Adding Capacitors At The Intake Point 1
9 A Large Building Is Taking 3 Phase Supply From Utility At Lv I E 400 V After Adding Capacitors At The Intake Point 1 (165.31 KiB) Viewed 30 times
9. A large building is taking 3-phase supply from utility at LV i.e. 400 V. After adding capacitors at the intake point of the electrical installation and the power factor at the intake point has been improved from 0.6 lag to 0.9 lag. As a result, the electrical distribution loss in the building is reduced approximately by: S Cap's Q = (0-jx) var. Q = +ve. (a) 0% (b) 10% (c) 20% (d) 30% P Cos 9=0:1/10 (PB) 0 = 53.13° Cose = 0.9 Page 24 (pf) 9 - 25.842% S= ph S3ph = 3
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply