An investor is exploring the possibility of building a chemical plant that can produce product Z. Based on the report pr

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

An investor is exploring the possibility of building a chemical plant that can produce product Z. Based on the report pr

Post by answerhappygod »

An investor is exploring the possibility of building a chemicalplant that can produce product Z. Based on the report provided bythe consultant, it is known that the investment cost for thedesired process technology, with a production capacity of 800,000tons/year, is IDR 500 billion.Investment financing consists of:- 70% factory establishment cost(depreciated on a straight-line basis over 5 years, and theresidual value of property, plant and equipment is 20% of theinitial value)- 30% working capitalThe composition of the investment funding is 75% loans from bankswith 15% interest rates, and the remaining 25% is equity with 10%cost of equity.Production costs for a capacity of 500,000 tonnes areestimated:- fixed costs: IDR 70 billion/year- Cost change : IDR 50,000 / ton of productThe selling price of product X is IDR 1,000,000/ton, and the profitis subject to a 25% tax. For a 5 year analysis period, you arerequired to:1. Prepare cash flow projections from the investment plan.2. Calculating PAYBACK PERIOD, IRR.3. Determine the break-even point of production (BEP).4. Calculating WACC and MARR.5. Write down your analysis of the investment plan.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply