Repair calls are handled by one repairman at a photocopy shop. Repair time, including travel time, is exponentially dist

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Repair calls are handled by one repairman at a photocopy shop. Repair time, including travel time, is exponentially dist

Post by answerhappygod »

Repair Calls Are Handled By One Repairman At A Photocopy Shop Repair Time Including Travel Time Is Exponentially Dist 1
Repair Calls Are Handled By One Repairman At A Photocopy Shop Repair Time Including Travel Time Is Exponentially Dist 1 (23.43 KiB) Viewed 18 times
Repair calls are handled by one repairman at a photocopy shop. Repair time, including travel time, is exponentially distributed, with a mean of 2.8 hours per call. Requests for copier repairs come in at a mean rate of 1.7 per eight-hour day (assume Poisson). Determine the following: a. The average number of customers awaiting repairs. (Round your answer to 2 decimal places Number of customers b. System utilization. (Round your answer to 2 decimal places.) System utilization % c. The amount of time during an eight-hour day that the repairman is not out on a call. (Round your answer to 2 decimal places.) Amount of time hours
c. The amount of time during an eight-hour day that the repairman is not out on a call. (Round your answer to 2 decimal places.) Amount of time hours d. The probability of two or more customers in the system. (Do not round intermediate calculations. Round your answer to 4 decimal places.) Probability
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply