The following represents a project that should be scheduled using the Critical Path Method (CPM) Activity A B C ES LS E

Posted: Fri Jul 01, 2022 9:07 am
by answerhappygod
The Following Represents A Project That Should Be Scheduled Using The Critical Path Method Cpm Activity A B C Es Ls E 1
The Following Represents A Project That Should Be Scheduled Using The Critical Path Method Cpm Activity A B C Es Ls E 1 (37.18 KiB) Viewed 81 times
The following represents a project that should be scheduled using the Critical Path Method (CPM) Activity A B C ES LS E F G H Immediate Time (Days) predecessors A A B C, D D, E F, G a 1 1 1 8² 3 0.444444444 2 0.111111111 2 0.111111111 3 0.1111111: 5 1.777777778 4 5 4 0.111111111 4 6 3.833 0.694444444 m b 3 5 2 3 2 3 4 11 2 3 4 3 1 ET 2 4 5 3.833 a. Complete the table b. Draw the Network Diagram using the template provided below 0.25 Activity (Duration) c. What is the critical path? d. What is the expected project completion time?" e. What is the probability of completing this project within 16 days? EF "