- The Following Represents A Project That Should Be Scheduled Using The Critical Path Method Cpm Activity A B C Es Ls E 1 (37.18 KiB) Viewed 80 times
The following represents a project that should be scheduled using the Critical Path Method (CPM) Activity A B C ES LS E
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
The following represents a project that should be scheduled using the Critical Path Method (CPM) Activity A B C ES LS E
The following represents a project that should be scheduled using the Critical Path Method (CPM) Activity A B C ES LS E F G H Immediate Time (Days) predecessors A A B C, D D, E F, G a 1 1 1 8² 3 0.444444444 2 0.111111111 2 0.111111111 3 0.1111111: 5 1.777777778 4 5 4 0.111111111 4 6 3.833 0.694444444 m b 3 5 2 3 2 3 4 11 2 3 4 3 1 ET 2 4 5 3.833 a. Complete the table b. Draw the Network Diagram using the template provided below 0.25 Activity (Duration) c. What is the critical path? d. What is the expected project completion time?" e. What is the probability of completing this project within 16 days? EF "